Projects & experience

Health, safety and ESG across 51 wind farms.

Twenty years of on-site oversight — from wind farms and hydropower to motorways and waste treatment plants. That experience is the grounding for every project ADV takes on today.

Portfolio monitored

51 wind farms across Greece, Bulgaria and Poland.

Over many years at TERNA ENERGY, Antonis Vourtsis was responsible for monitoring them against health and safety, environmental and ESG criteria.

  • Greece
  • Bulgaria
  • Poland

Sites both operating and under construction. Regular on-site inspections, recording of findings, and tracking of corrective actions through to closure.

20+
years in the field
5
RES technologies
3
countries
Agios Georgios wind farm: turbines running in line along a rocky headland above the sea.
Agios Georgios wind farm. Photograph: TERNA ENERGY.

In practice

What the monitoring covered at each site.

Health & safety

  • On-site inspections at wind farms both operating and under construction
  • Compliance checks against health and safety legislation
  • Recording of findings and tracking of corrective actions
  • Contractor safety management on site

Environment

  • Compliance checks against environmental permit conditions (AEPO)
  • Environmental monitoring and reporting
  • Waste management across the sites
  • Oversight of bird monitoring programmes

ESG criteria

  • Collection and verification of ESG indicators per site
  • Support for the corporate sustainability report
  • Representative of TERNA ENERGY in CDP
  • ESG criteria in ISS-Corporate assessments

See all QHSE and ESG services

Technologies

Five renewable technologies.

The portfolio was not limited to wind: hydropower, pumped storage, photovoltaics and biogas.

  • Wind farms Greece, Bulgaria, Poland
  • Small hydropower Dafnozonara – Sanidi, Eleousa
  • Pumped storage Amfilochia, Aetolia-Acarnania
  • Photovoltaics Greece
  • Biogas Adendro, Thessaloniki
Dafnozonara – Sanidi SHPP: the dam and spillway of a small hydropower plant in a mountain river bed.
Dafnozonara – Sanidi SHPP. Photograph: TERNA ENERGY.

Reference project

Amfilochia pumped storage.

The largest energy storage investment in Greece, designated by the EU as a Project of Common Interest (PCI 2.9). Public project data: TERNA ENERGY.

Installed capacity
680 MW generation / 730 MW pumping
Annual output
~816,000 MWh
Investment
≈ €650 million
Region
Aetolia-Acarnania
Upper reservoirs
Agios Georgios and Pyrgos
Lower reservoir
Lake Kastraki
Overhead aerial view of the Agios Georgios dam under construction at Amfilochia, with site roads winding around it.
Agios Georgios dam, Amfilochia — August 2026. Photograph: TERNA ENERGY.

Infrastructure & environment

Motorways and waste treatment plants.

Before and alongside the wind portfolio, Antonis Vourtsis held responsibility for health, safety and the environment on major infrastructure and environmental management projects, from 2007 to 2025.

The Moreas Motorway in service, both carriageways climbing a hill.

2007–2014

Moreas Motorway

Head of health and safety, environment and signage during construction of the motorway.

Map of the Olympia Odos route, from Elefsina to Patras and Pyrgos.

2014–2017

Olympia Odos Motorway

Health and safety, with responsibility for the aggregates site.

The waste treatment plant at Dodoni, Ioannina, its processing halls set against the mountain.

2018–2025

Aeiforiki Ipirou

Health, safety and environment during construction and operation of the waste treatment plant at Dodoni, Ioannina.

Satellite map of the Peloponnese marking the three treatment plants and two transfer stations.

2021–2025

Perivallontiki Peloponnisou

Health, safety and environment during construction and operation of three waste treatment plants and two transfer stations.

Let’s build a safer, sustainable and resilient future together.

Contact us to discuss how ADV can support your goals.